Ground mounted plants

Ground mount removes the roof constraint and replaces it with three new ones: land, soil and evacuation. Get those right and everything downstream is straightforward.

maximum plant size
0 MW
acres per MW
0 -5
evacuation capable
0 kV
warranty
0 yr+

Land, soil, evacuation in that order

Before a single module is procured, three questions decide whether a ground-mount project works: is the land title clean and the terrain workable, what does the soil bear, and where does the power actually go.

We front-load all three. Geotechnical investigation sets the foundation design; a topographical survey sets the row spacing and drainage; and an evacuation study establishes the interconnection point before the layout is frozen.

What the contract actually covers

Everything below is delivered by us and written into your agreement — no line items appearing later as extras.

Land and title assessment

Terrain suitability, access, drainage and documentation review.

Geotechnical investigation

Bore testing and soil resistivity to set foundation and earthing design.

Topographical survey

Contour mapping driving row pitch, inter-row shading and drainage layout.

Civil works

Foundations, internal roads, cable trenching, boundary and control room.

Module mounting structure

Fixed-tilt or seasonally adjustable, engineered to wind and seismic zone.

Evacuation and switchyard

Inverter stations, transformers, HT panels and metering.

Grid connectivity approvals

Connectivity application, CEIG clearance and commissioning.

Full-scope O&M

Module cleaning, vegetation management, thermography and reporting.

Technical summary

Indicative figures for planning. Your survey report replaces every one of these with a measured value.

Frequently asked questions

How much land per megawatt?

Around four to five acres for a fixed-tilt plant at Odisha’s latitude, including inter-row spacing, roads and switchyard. Uneven terrain increases the requirement.

No. We assess suitability and advise on technical fit, but acquisition, title verification and land-use conversion should go through your own legal counsel.

Trackers raise yield but add capital cost and moving parts to maintain. At Odisha irradiance levels fixed tilt usually gives the better risk-adjusted return below about 5 MW — we model both.

Other solutions

Solar Water Pump

PM-KUSUM aligned solar pumping solutions for agricultural and irrigation use.

Solar Carport

Dual-purpose shaded parking structures that generate power over your vehicles.

Operation & Maintenance

Scheduled cleaning, monitoring and performance audits under AMC.

Ready to size it properly?

Book a free site survey and get a fixed quote with a measured generation estimate — not a phone-call guess.