suryorasolar

Fourteen years on Odisha roofs

Suryora is the solar EPC arm of MK Groups. We have been sizing, building and maintaining solar plants in this state since 1999 — long enough to have gone back and fixed the things we learned from.

Years in operation
0 +
Projects delivered
0 +
Capacity installed
0 MW
Engineers on payroll
0 +

A contracting business that moved into generation

MK Groups has been an electrical contractor in Odisha since well before solar was commercially viable here. When rooftop economics finally turned, we already had the licences, the crews and the DISCOM relationships — what we added was solar engineering.

That order matters. Plenty of solar companies started with panels and learned electrical work afterwards. We came the other way round, which is why our failure rates sit where they do and why our engineers are on payroll rather than hired by the job.

Today Suryora covers four customer segments and eight lines of work across thirty cities, with regional maintenance crews stationed outside Bhubaneswar so that a fault in Rourkela is not a six-hour drive from the nearest technician.

Four commitments we are willing to be judged on

Quote what we can deliver

If a roof won't take the load or the shading kills the return, we say so at survey rather than at handover.

Own the whole line

Design, procurement and construction sit with one team. There is never a second company to blame.

Measure, then promise

Generation estimates come from measured shading and real consumption data, not from a nameplate multiplied by sunshine hours.

Stay after commissioning

The warranty runs twenty-five years. So does the phone number.

From first rooftop to forty-two megawatts

The order of these matters — each stage only became possible because the previous one built the capability.

1999

Founded in Bhubaneswar

Started as an electrical contracting arm of MK Groups, taking on the first rooftop installations in the city.

2015

First megawatt

Crossed 1 MW of cumulative installed capacity and brought design engineering fully in house.

2018

Industrial and ground mount

Commissioned the first captive ground-mounted plant for a manufacturing client in western Odisha.

2021

Statewide coverage

Service network extended to thirty cities and towns, with regional O&M crews stationed outside the capital.

2024

PM Surya Ghar

Became a registered vendor under the national rooftop scheme, filing subsidy applications on behalf of households.

2026

42 MW and counting

Over three thousand two hundred projects delivered across four customer segments.

The people accountable for your project

Manoj Kumar Sahoo

Managing Director

Founded the solar division in 2012 after fifteen years in electrical contracting.

Dr Suchitra Panda

Head of Engineering

Leads plant design and structural review. PhD in power systems.

Rajesh Behera

Head of Projects

Runs site execution across all four segments and the regional crews.

Anita Nayak

Head of Customer Operations

Owns survey scheduling, subsidy filing and post-commissioning support.

Come and see a plant we built

We’ll arrange a site visit to a commissioned system in your segment — talk to the owner without us in the room.

Scroll to Top