Institutional solar
Hospitals and campuses cannot pause. Institutional solar is as much a programme-management problem as an engineering one.
Built around operations that can't stop
A district hospital has theatres running, an engineering campus has labs on a semester calendar, a government office has public-facing hours. Each imposes constraints on when work can happen and which circuits can be touched.
We plan institutional projects in phases with defined shutdown windows agreed in advance, and we design so that critical circuits — theatres, cold chain, servers — are never dependent on a stage that is still under construction.
What the contract actually covers
Everything below is delivered by us and written into your agreement — no line items appearing later as extras.
Tender-compliant documentation
GeM and e-procurement submissions with full technical compliance sheets.
Phased execution plan
Block-by-block sequencing agreed with your facilities team before mobilisation.
Critical-load segregation
Theatre, cold chain and data circuits isolated from construction stages.
Multi-building design
Distributed arrays across blocks with consolidated metering.
Safety documentation
Method statements, risk assessments and site-specific permits.
Training handover
National Portal registration and claim tracked through to disbursal.
Compliance certification
CEIG, fire and electrical inspectorate clearances.
Long-term AMC
Multi-year maintenance contracts structured for annual budget cycles.
Technical summary
Indicative figures for planning. Your survey report replaces every one of these with a measured value.
- System type
- Grid-tied, multi-block
- Typical range
- 50 kW – 1 MW
- Procurement
- GeM, e-tender, direct
- Execution
- Phased, shutdown-window based
- Documentation
- Full tender and compliance pack
- Payback
- 3.5 – 5 years, typical
Frequently asked questions
Do you work on GeM tenders?
Yes. We prepare complete technical and financial bids including compliance matrices, BOQs and past-performance documentation.
How do you handle exam or surgery schedules?
Shutdown windows are agreed in writing before mobilisation and built into the programme. Work that requires isolation is scheduled into vacation periods or planned downtime.
Can funding come from CSR?
Frequently, yes. We provide the technical documentation and impact estimates that CSR committees typically require, though the funding decision sits with your institution.
Other solutions
Ground Mounted Plants
Utility-scale and captive ground-mount plants with full civil and structural design.
Solar Water Pump
PM-KUSUM aligned solar pumping solutions for agricultural and irrigation use.
Solar Carport
Dual-purpose shaded parking structures that generate power over your vehicles.
Ready to size it properly?
Book a free site survey and get a fixed quote with a measured generation estimate — not a phone-call guess.